अगला

Kurt Hughes 48' Charter Catamaran 2025

227 विचारों· 18/12/24
pedigreecatamarans
pedigreecatamarans (@pedigreecatamarans)
ग्राहकों
0

This is HH#1 (Hull Half #1) process to start a hull half. The process is called Shiny Side Down placing the material down onto the prepared surface then adding foam and vacuum bagging down. This creates a smooth finish for this mid-section of each hull half. It is then placed into the mold shiny side down and zip tied to the mold to hold its shape.

और दिखाओ

 0 टिप्पणियाँ sort   इसके अनुसार क्रमबद्ध करें


फेसबुक टिप्पणियाँ

अगला