下一个

Kurt Hughes 48' Charter Catamaran 2025

227 意见· 18/12/24
帆船

This is HH#1 (Hull Half #1) process to start a hull half. The process is called Shiny Side Down placing the material down onto the prepared surface then adding foam and vacuum bagging down. This creates a smooth finish for this mid-section of each hull half. It is then placed into the mold shiny side down and zip tied to the mold to hold its shape.

显示更多

 0 注释 sort   排序方式


脸书评论

下一个