Susunod

Kurt Hughes 48' Charter Catamaran 2025

227 Mga view· 18/12/24
pedigreecatamarans
0

This is HH#1 (Hull Half #1) process to start a hull half. The process is called Shiny Side Down placing the material down onto the prepared surface then adding foam and vacuum bagging down. This creates a smooth finish for this mid-section of each hull half. It is then placed into the mold shiny side down and zip tied to the mold to hold its shape.

Magpakita ng higit pa

 0 Mga komento sort   Pagbukud-bukurin Ayon


Mga Komento sa Facebook

Susunod