
Kurt Hughes 48' Charter Catamaran 2025
0
0
227 ভিউ·
18/12/24
ভিতরে
পালতোলা নৌকা
This is HH#1 (Hull Half #1) process to start a hull half. The process is called Shiny Side Down placing the material down onto the prepared surface then adding foam and vacuum bagging down. This creates a smooth finish for this mid-section of each hull half. It is then placed into the mold shiny side down and zip tied to the mold to hold its shape.
আরো দেখুন

0 মন্তব্য
sort ক্রমানুসার
ফেসবুক মন্তব্য