Следующий

105 - Warranty work in Phuket

312 Просмотры· 18/06/24
Onfilandtime
Onfilandtime (@Onfilandtime)
Подписчики
0

This episode focuses on boat work. Like all new boats, we've had some warranty issues that needed to be addressed. So we get to work on some of the ones we haven't had time or resources to properly address already. Things we tackle include: - Fixing a back-filling toilet that had an obstruction in the supply valve. - Fixing an obstructed macerator pump on another toilet. - Replacing the Echopilot forward-looking sonar transmitter. - Upgrading the scuba fill whip quick-connect fitting to a more resistant stainless steel version. - Fixing the wall liner at some of the windows, where the factory glue was not sticking. - Identifying a cause of our poor solar-charging performance: a non-functional solar panel. - Replacing a fuel tank level sensor. - Locating the cause of a fuel supply issue for the generator. It was a hairline crack at a weld in the intake tube, so we had a new tube welded on. - Fixing a set screw on the salon door hardware - Paint touch-ups around the newly sealed platform lock area. But it wasn't ALL work. We had the fortunate opportunity to attend a great Christmas Eve party and spend some time at the marina pool at Christmas. Kevin also continued his commercial marine training by attending the Efficient Deck Hand course. We had a short sail to relocate to Ao Po Marina from Yacht Haven Marina. Thanks for following! Music downloaded at https://filter.one and Youtube music Video edited by Jea, using Adobe Premiere Elements. Visit us at http://www.onfilandtime.com/

Показать больше

 0 Комментарии sort   Сортировать по


Комментарии Facebook

Следующий