close

Welcome aboard to the our video site for sailors. We are being constantly blasted by scammers and pirates, so registration is  invite only


contact@sailorsahoy.com with "Invite". No spam, no newsletters. Just a free account

Bir sonraki

The BIG Sailboat Project: Episode 6 Trailer

10,037 Görünümler· 14/05/14

4.5 Hours | 11 Episodes Available on Vimeo On Demand for viewing on all screens: computer, smart phone, tablet, smart tv. https://vimeo.com/ondemand/thebigsailboatproject Rent All $15.99 | Buy All $25.99 DVD available at TheSailingChannel Store http://www.thesailingchannel.tv/store2/index.php?maincat_id=10&subcat_id=6 Sandra builds winch mounts out of scrap steel pipe for the large, Lewmar 55 main winches and finishes off the back of the pilot house. Sandra builds and installs the fuel tanks, and makes chain plates. They weld up a metal door frame for the forward sail locker bulkhead and install two more cabin bulkheads. And they finalize and test the experimental internal engine keel cooler system.

Daha fazla göster

 0 Yorumlar sort   Göre sırala


Facebook Yorumları

Bir sonraki