close

Welcome aboard to the our video site for sailors. We are being constantly blasted by scammers and pirates, so registration is  invite only


contact@sailorsahoy.com with "Invite". No spam, no newsletters. Just a free account

Celana pendek Membuat

Installing a new floor in an Edencraft is far from a simple task. This 565 build has reached the Joining Shed stage. After completing the stringers, full tank installation, foaming, leveling, and glassing, the floor is finally ready for a dry fit. Once the dry fitting is complete, both surfaces will be prepped. The base of the floor will be resin-coated, and the hull will be layered with chopped fiberglass and resin. With precision, the floor is then carefully placed in position and weighted down to create a strong chemical bond between the two surfaces. From this point, any gap between the floor liner and the hull will be filled with foam, sanded to perfection, and sealed with a layer of fibreglass. Find out more about Edencraft's exceptional build quality here 👉 https://hubs.la/Q02Lpg130 _______________________________ See video rundowns of every boat to leave the Edencraft factory, full Edencraft TV episodes, customer reviews and more? Subscribe to our channel and never miss a video! Or visit us online: https://www.edencraft.com.au https://www.facebook.com/Edencraft.Boats https://www.instagram.com/edencraft.boats

edencraftinternationalptyltd

0

0

1,049

www.mauisails.com

mauisailshawaii

0

0

39

Daily Update for January 12, 2010. Today we'll be working on Cordes' murphy beds and Jenkins football bed case goods. - Captured Live on Ustream at http://www.ustream.tv/channel/wwbeds-shop

chrisdaviswwbeds

0

0

1

0

sailingmeera

0

0

1,156

Unpacking Candice's new Brompton at London Fields Cycles in Hackney

sailingelectra

0

0

2,784

0

mvkariwan64

0

0

1,205