close

Welcome aboard to the our video site for sailors. We are being constantly blasted by scammers and pirates, so registration is  invite only


contact@sailorsahoy.com with "Invite". No spam, no newsletters. Just a free account

اگلا

PREPARING FOR INFUSION: DAZCAT 1500 DSA TIMELAPSE

16 مناظر· 16/10/25
dazcatcatamarans
0

Infusing the boat in a vacuum-sealed bag is one of the most critical and precise stages of the composite build process. This timelapse takes you behind the scenes as we prepare the mould for infusion, a stage that determines the strength, weight, and finish of the final structure. You’ll see how we lay down multiple layers of reinforcement, peel ply, flow media, and resin feed lines before sealing the entire mould under vacuum. Every joint, tape, and fitting is carefully checked for leaks to ensure a perfect vacuum draw. The goal is even resin distribution and complete fibre wet-out resulting in a strong, lightweight laminate with minimal voids. This is where craftsmanship meets engineering combining advanced materials, careful planning, and years of experience to deliver a flawless infusion. Watch the next in the series to hear from Brendan (Director and Projects Manager) and Dan (Workshop Manager) how this is achieved.

مزید دکھائیں

 0 تبصرے sort   ترتیب دیں


فیس بک کے تبصرے

اگلا