Следующий

Kit E35 Finish Epoxy on the Port Canoe of our Catamaran

12,399 Просмотры· 27/05/23
Sailingsvlynx
Sailingsvlynx (@Sailingsvlynx)
Подписчики
0

Our goal this week was to finish epoxying all the strips on to the port hull, and we got some other work done on the forebeam of our 50' performance/cruising catamaran, S/V Lynx! This Schionning Design Kit Catamaran is coming along, and we feel we are still on track for a two year build before we splash to take our sailboat around the world on a double circumnavigation voyage on our new boat. So, come join Captain Blood and Admiral Marianne, with our XO, Brian on this epic journey to build and sail our cat! The S/V Lynx Website: https://www.svlynx.com Patreon (help us out by becoming part of our Patron Crew!) https://www.patreon.com/SV_Lynx?fan_landing=true 0:00:00-Introduction 0:00:42-S/V Lynx Logo 0:00:57-What we work on while waiting for a strip to cure 0:02:15-Cousin Trever comes to help epoxy and sand the port canoe. 0:04:44-Schionning Design meeting results and new plans 0:09:06-Cousin Travis comes to help us sand the port canoe. 0:10:35-Sanding the excess epoxy off the strip planking. 0:16:07-More strips epoxied onto the inboard side of the port canoe 0:16:49-Viewer suggestions vs Schionning Design instructions. 0:19:02-Dry fitting planks to the forebeam. 0:25:07-Final strips epoxied to the port canoe 0:28:10-Thanks to our Patrons and Sponsors

Показать больше

 0 Комментарии sort   Сортировать по


Комментарии Facebook

Следующий