Shuswap Marina Breakwater Replacement 2020

396 Ansichten· 07/04/20
shuswapmarina
0

Pictorial of our breakwater replacement from Feb 3rd to April 3rd 2020. Engineering: Northwest Hydraulic Consultants Herold Engineering Qualified Environmental Professional: Triton Environmental Pile Driving and welding: RW Gallant Equipment Excavation and Rock Installation: Lessard Excavating Rock Provided By: Baird Bros Rock Quarry