下一个

Preparing the master cabin for refit

1,200 意见· 10/02/24
帆船

We have a lot of work to do for our interior refit. The first job is to remove all the lining and timber furniture from the master cabin. We have carbon fibre door frames and composite doors to install for the engine room. That means cutting out the frames a little neater to fit the new ones.

显示更多

 0 注释 sort   排序方式


脸书评论

下一个