הבא

Kit E96: Changing Build Plans

10,811 צפיות· 27/07/24
Sailingsvlynx
0

We ran into a problem on the bridgedeck and had to switch up our build plan so that we don't fall behind. So we temporarily stopped work on the bridgedeck and completed the bulkhead tabbing, then got started on bonding the forebeam to the hulls. Captain Blood, Admiral Marianne, and our XO, Brian, are working hard to get this sailboat built so we can start our circumnavigation voyage around the planet on our Solitaire 1520, performance/cruising catamaran from Schionning Designs. The S/V Lynx Website: https://www.svlynx.com Patreon (help us out by becoming part of our Patron Crew!) https://www.patreon.com/SV_Lynx?fan_landing=true 0:00:00-Introduction to this week's video 0:01:27-S/V Lynx Logo 0:01:42-Creating basalt troughs in our planks 0:03:33-Tabbing the last bulkheads 0:10:24-Prepping our mast supports. 0:12:50-Changing our build plans 0:15:54-Stuff arrived from China 0:17:51-Tabbing the final bulkhead! 0:25:21-Trimming and slicing our Forebeam 0:29:35-Wrap up with the Admiral and Captain

להראות יותר

 0 הערות sort   מיין לפי


הבא