التالي

Rebuild vid 3

26 المشاهدات· 30/06/24
wharfrat9707
0

I got the water tank installed below the plywood and 2/3 finished cutting out the shape of the bed. Gotta finish up front first before i can go further. The song in the background is colter wall. check him out.

أظهر المزيد

 0 تعليقات sort   ترتيب حسب


تعليقات الفيسبوك

التالي