close

Welcome aboard to the our video site for sailors. We are being constantly blasted by scammers and pirates, so registration is  invite only


contact@sailorsahoy.com with "Invite". No spam, no newsletters. Just a free account

Shorts Lumikha

By public demand, here is another one of the interludes I produced for the Top The Bill public screens installed around Port Vila, Santo & Noumea around 2006-2010. This one shows some areas of Ambae.

tropicalsailinglife

0

0

748

Foppa Sailing Week 2025 | Tag 6 | 15/05/2025 | Wettfahrttag 4 & Siegerehrung Weitere Informationen: https://www.foppasailingweek.com/

fsweek2023

0

0

80

0

sailingestrellapolar

0

0

1,531

Available for delivery this November, this exquisite Ferretti Yachts 780 HT is truly a nautical work of art. The newly designed interior now offers the option of either a classic or a contemporary design following the footsteps of the yacht’s most recent predecessor in the Ferretti Yachts 500 and the Ferretti Yachts 1000. On the stern, with the large beach club, the new rear-facing large sun pads transform from the two doors on the yacht’s garage to help create a luxurious area to relax on the water’s edge. The interior still has 4 cabins, a full-beam, mid-ship owner’s suite, a forward VIP cabin, and two more guest cabins all with their own heads. For the Asian market, there will be an option to change the owner’s cabin to a large entertainment room while moving the galley to the lower deck to create a larger open bar area with the existing salon. In the standard version, the salon now features 3 options with the standard layout featuring a closed bar area from the dining area, a powered glass partition separating the bar area from the dining space, or a completely open concept for the North American market. The Ferretti Yachts 780 also has crew quarters aft with a cabin for the captain and one for the crew each with two beds and a personal bathroom. The captain’s cabin is replaced with a large storage area in the standard layout. Available through Executive Yacht 1-888-237-1647

yachtingbc

0

0

361

Thanks for watching! Check out our new site! www.Sailbros.com ________________________ Follow us on Instagram: http://instagram.com/sailbros/ Like us on Facebook: https://www.facebook.com/pages/SailBros/1069348643090610 ________________________ #sailing #sailboat #cheoylee #sail #sailbros

Sailbros

0

0

1,406

The construction of the Tower began in 1173. Originally designed to be a bell tower, it stood upright for over 5 years, but when the third floorwas completed in 1178 it began to lean. Italians were shocked by the event, as the tower began to lean ever so slightly. The thing is the foundation of the tower, which is only 3-meter deep, was built on a dense clay mixture. This mix impacted the soil and furthermore the clay was not strong enough to hold the tower upright. As a result the weight of the tower began to diffuse downward until it had found the weakest point. Due to this problem, construction works stopped for 100 years. The government decided to focus on its war with Genoa and hope that the soil would settle in the meantime.

sailingstorieswithme

0

0

115