

0
नवीनतम वीडियो
continuing to build a marine freezer.
The dodger is at the boat and installation is moving forward
building and installing a hard dodger part 1
Building our new better insulated freezer box part one
120VAC outlets
short explanation of insulation install
a look at our new v-berth insulation
Numerous leaks mostly from though deck fasteners need repair and so the head liner is coming out.
re-sizing a deadlight cutout with salvaged flooring epoxy and chopped fiberglass mat
0
FILLING THE OVERSIZED PORTLIGHT APATURE
new vs old window
New polycarbonate in our frosted deadlights
removing the outer gasket
starboard aft
Prepping the new poly
0
0
0
0
और दिखाओ