Laatste video's

dulcineasailing
38 Bekeken · 5 maanden geleden

Update on our leg from Joselita bay to Cabo San Lucus

dulcineasailing
25 Bekeken · 7 maanden geleden

our trip from Ensenada to Bahai Maria and the town of San Quintin BC

dulcineasailing
13 Bekeken · 7 maanden geleden

Some stuff we did while in Ensenada

dulcineasailing
22 Bekeken · 7 maanden geleden

Replacing a gasket on our exhaust manifold cooler

dulcineasailing
9 Bekeken · 8 maanden geleden

Fabricating and installing Mast Gates

dulcineasailing
22 Bekeken · 1 jaar geleden

Our stop in Humbolt Bay, CA

dulcineasailing
22 Bekeken · 1 jaar geleden

Broken weld on our solar arch require removal and repair

dulcineasailing
30 Bekeken · 1 jaar geleden

An explanation of our main bank shutdown

dulcineasailing
2 Bekeken · 1 jaar geleden

intro version2

dulcineasailing
51 Bekeken · 2 jaar geleden

continuing to build a marine freezer.

dulcineasailing
67 Bekeken · 2 jaar geleden

The dodger is at the boat and installation is moving forward

dulcineasailing
21 Bekeken · 2 jaar geleden

building and installing a hard dodger part 1

dulcineasailing
12 Bekeken · 2 jaar geleden

Building our new better insulated freezer box part one

dulcineasailing
5 Bekeken · 3 jaar geleden

120VAC outlets

dulcineasailing
31 Bekeken · 3 jaar geleden

short explanation of insulation install

dulcineasailing
51 Bekeken · 3 jaar geleden

a look at our new v-berth insulation

dulcineasailing
8 Bekeken · 3 jaar geleden

Numerous leaks mostly from though deck fasteners need repair and so the head liner is coming out.

dulcineasailing
11 Bekeken · 3 jaar geleden

re-sizing a deadlight cutout with salvaged flooring epoxy and chopped fiberglass mat

dulcineasailing
5 Bekeken · 3 jaar geleden

0

dulcineasailing
6 Bekeken · 3 jaar geleden

FILLING THE OVERSIZED PORTLIGHT APATURE

Laat meer zien