Najnoviji video zapisi

dulcineasailing
38 Pogledi · 5 mjeseca prije

Update on our leg from Joselita bay to Cabo San Lucus

dulcineasailing
25 Pogledi · 7 mjeseca prije

our trip from Ensenada to Bahai Maria and the town of San Quintin BC

dulcineasailing
13 Pogledi · 7 mjeseca prije

Some stuff we did while in Ensenada

dulcineasailing
22 Pogledi · 7 mjeseca prije

Replacing a gasket on our exhaust manifold cooler

dulcineasailing
9 Pogledi · 8 mjeseca prije

Fabricating and installing Mast Gates

dulcineasailing
22 Pogledi · 1 godina prije

Our stop in Humbolt Bay, CA

dulcineasailing
22 Pogledi · 1 godina prije

Broken weld on our solar arch require removal and repair

dulcineasailing
30 Pogledi · 1 godina prije

An explanation of our main bank shutdown

dulcineasailing
2 Pogledi · 1 godina prije

intro version2

dulcineasailing
51 Pogledi · 2 godine prije

continuing to build a marine freezer.

dulcineasailing
67 Pogledi · 2 godine prije

The dodger is at the boat and installation is moving forward

dulcineasailing
21 Pogledi · 2 godine prije

building and installing a hard dodger part 1

dulcineasailing
12 Pogledi · 2 godine prije

Building our new better insulated freezer box part one

dulcineasailing
5 Pogledi · 3 godine prije

120VAC outlets

dulcineasailing
31 Pogledi · 3 godine prije

short explanation of insulation install

dulcineasailing
51 Pogledi · 3 godine prije

a look at our new v-berth insulation

dulcineasailing
8 Pogledi · 3 godine prije

Numerous leaks mostly from though deck fasteners need repair and so the head liner is coming out.

dulcineasailing
11 Pogledi · 3 godine prije

re-sizing a deadlight cutout with salvaged flooring epoxy and chopped fiberglass mat

dulcineasailing
5 Pogledi · 3 godine prije

0

dulcineasailing
6 Pogledi · 3 godine prije

FILLING THE OVERSIZED PORTLIGHT APATURE

Prikaži više