close

Welcome aboard to the our video site for sailors. We are being constantly blasted by scammers and pirates, so registration is  invite only


contact@sailorsahoy.com with "Invite". No spam, no newsletters. Just a free account

Kratke hlače Stvoriti

A short video with Querer to Poros and back

poseidon1955

0

0

329

Greenland www.oceanresearchproject.org

oceanresearchproject

0

0

444

inbarcacondario

0

0

361

Installing a new floor in an Edencraft is far from a simple task. This 565 build has reached the Joining Shed stage. After completing the stringers, full tank installation, foaming, leveling, and glassing, the floor is finally ready for a dry fit. Once the dry fitting is complete, both surfaces will be prepped. The base of the floor will be resin-coated, and the hull will be layered with chopped fiberglass and resin. With precision, the floor is then carefully placed in position and weighted down to create a strong chemical bond between the two surfaces. From this point, any gap between the floor liner and the hull will be filled with foam, sanded to perfection, and sealed with a layer of fibreglass. Find out more about Edencraft's exceptional build quality here 👉 https://hubs.la/Q02Lpg130 _______________________________ See video rundowns of every boat to leave the Edencraft factory, full Edencraft TV episodes, customer reviews and more? Subscribe to our channel and never miss a video! Or visit us online: https://www.edencraft.com.au https://www.facebook.com/Edencraft.Boats https://www.instagram.com/edencraft.boats

edencraftinternationalptyltd

0

0

1,049

On Monday 16th Oct 2017 Hurricane Ophelia moved up the West coast of Ireland creating storm force winds on across the Irish Sea and the East coast. Hopefully the storm pass without further damage to boats.

bottomupboats

0

0

629

Some weather building in the South Atlantic.

tallshipspacific

0

0

169