Installing a new floor in an Edencraft is far from a simple task.
This 565 build has reached the Joining Shed stage. After completing the stringers, full tank installation, foaming, leveling, and glassing, the floor is finally ready for a dry fit. Once the dry fitting is complete, both surfaces will be prepped. The base of the floor will be resin-coated, and the hull will be layered with chopped fiberglass and resin.
With precision, the floor is then carefully placed in position and weighted down to create a strong chemical bond between the two surfaces. From this point, any gap between the floor liner and the hull will be filled with foam, sanded to perfection, and sealed with a layer of fibreglass.
Find out more about Edencraft's exceptional build quality here 👉 https://hubs.la/Q02Lpg130
_______________________________
See video rundowns of every boat to leave the Edencraft factory, full Edencraft TV episodes, customer reviews and more?
Subscribe to our channel and never miss a video!
Or visit us online:
https://www.edencraft.com.au
https://www.facebook.com/Edencraft.Boats
https://www.instagram.com/edencraft.boats
0
0
0
1,049
The top deck of our first 255 Formula windscreen model being laid up.
Find out more about Edencraft's exceptional build quality here 👉 https://hubs.la/Q02Lpg130
_______________________________
See video rundowns of every boat to leave the Edencraft factory, full Edencraft TV episodes, customer reviews and more?
Subscribe to our channel and never miss a video!
Or visit us online:
https://www.edencraft.com.au
https://www.facebook.com/Edencraft.Boats
https://www.instagram.com/edencraft.boats