kmyachtbuilders5293
kmyachtbuilders5293

kmyachtbuilders5293

(@kmyachtbuilders5293)

      |      

Iscritti

   Ultimi video

kmyachtbuilders5293
493 Visualizzazioni · 14 anni fa

The Tulip is hoisted up to lower the lift keel and fill it with lead.

kmyachtbuilders5293
600 Visualizzazioni · 14 anni fa

The Tulip is hoisted up to lower the lift keel to fill it with lead

kmyachtbuilders5293
803 Visualizzazioni · 14 anni fa

The Tulip is hoisted up to lower the keel to fill it with lead.

kmyachtbuilders5293
6,002 Visualizzazioni · 14 anni fa

Sailing with the Bestevaer 45ST on a very quiet day on the IJsselmeer.

kmyachtbuilders5293
2,108 Visualizzazioni · 14 anni fa

Sailing the Bestewind 50 on a very quiet day on the Frisian IJsselmeer in Holland.

kmyachtbuilders5293
896 Visualizzazioni · 14 anni fa

Almost no wind on this beautiful day at the end of September on the IJsselmeer in Holland. Filmed from the Bestevaer 45 ST.

kmyachtbuilders5293
4,182 Visualizzazioni · 14 anni fa

Bestewind 50 sailing on the IJsselmeer, but there is almost no wind. Beautiful day though, end of September. Filmed from Bestevaer 45ST.

kmyachtbuilders5293
4,121 Visualizzazioni · 14 anni fa

De Bestewind 50 out on a test sail on a beautiful evening in Makkum

kmyachtbuilders5293
5,039 Visualizzazioni · 14 anni fa

De Bestewind 50 out on a test sail on a beautiful evening in Makkum

kmyachtbuilders5293
4,220 Visualizzazioni · 14 anni fa

De Bestewind 50 out on a test sail on a beautiful evening in Makkum

kmyachtbuilders5293
1,503 Visualizzazioni · 14 anni fa

Here is the GRP hull almost finished.

kmyachtbuilders5293
2,819 Visualizzazioni · 14 anni fa

Here is the GRP hull being moved from one location at the yard to the other.

kmyachtbuilders5293
775 Visualizzazioni · 14 anni fa

The 88ft long Tulip (by German Frers) was moved from the aluminium construction area, to the finishing area.

kmyachtbuilders5293
346 Visualizzazioni · 14 anni fa

The 88ft long Tulip (by German Frers) was moved from the aluminium construction area, to the finishing area

kmyachtbuilders5293
1,277 Visualizzazioni · 14 anni fa

The 88ft long Tulip (by German Frers) was moved from the aluminium construction area, to the finishing area

kmyachtbuilders5293
233 Visualizzazioni · 14 anni fa

Deze video is geüpload vanaf een Android-telefoon.

kmyachtbuilders5293
229 Visualizzazioni · 14 anni fa

Deze video is geüpload vanaf een Android-telefoon.

kmyachtbuilders5293
548 Visualizzazioni · 14 anni fa

Deze video is geüpload vanaf een Android-telefoon.

kmyachtbuilders5293
401 Visualizzazioni · 14 anni fa

Deze video is geüpload vanaf een Android-telefoon.

kmyachtbuilders5293
2,112 Visualizzazioni · 14 anni fa

The Axonite 69 was built at K&M Yachtbuilders in Makkum. She is 69 feet long and has 3 cabins, 2 toilets and a large pilot house. The lift keel provides for entering shallow waters and harbours.

Mostra di più