4 days of hard yakka- but look at the amazing result.
The final paint work and non skid will be done after we finish dealing with the topsides and bottom.
0
0
0
21
Cleaning up the deck and preparing it for some filling, sanding and paint.The final paint job & non skid will not happen till we have done the topsides and antifouling.