Suivant

Installing a Compression Post on an 1965 Alberg 30 Sailboat

436 Vues· 21/03/25
SailingTritea
SailingTritea
2 Les abonnés
2
Dans Film

Episode #179 - Cutting up my own boat

Hello Friends, This is a throwback project video from the summer of 2020 when we started the massive project of redesigning and rebuilding our head.

One of only two real weaknesses of Alberg 30s is on the early models the laminated deck beam below the mast can delaminate and allow the rig to go slack and possibly dismast (the other known weakness is undersized chainplate bolts)

To solve this problem I installed a compression post under the mast and moved the pass-through to the V-Berth to starboard. This also allowed us to be able to enclose the head and turn it into a “wet head” so we could install a shower

This first episode in that saga covers me cutting out the bulkheads and Camille installing the compression post.


If you enjoy our channel please "Like" the videos and Subscribe so you don't miss any future episodes.

If you find the videos helpful or entertaining and would like to contribute to the refit or Camille's beer fund you can become a Patron at: https://www.patreon.com/sailorjames

or if you would prefer to make a one time contribution you can send it via PAYPAL to jamesthesailorman@gmail.com

Love,
James

JOIN OUR PATREON CREW:
Patreon: https://www.patreon.com/sailorjames
Amazon Gear List: https://www.amazon.com/hz/wish....list/ls/2L22ZF19M8WY

Website: http://svtriteia.com
Tracker: https://forecast.predictwind.c....om/tracking/display/

Instagram:
http://www.instagram.com/james.the.sailor.man

Montre plus

 0 commentaires sort   Trier par


Suivant