Hasta la próxima

Hooking up the plumbing on the head on an Alberg 30 - Part 3

386 vistas· 21/03/25
SailingTritea
SailingTritea
2 Suscriptores
2

On this episode I install the ports on the holding tank, get all the plumbing sorted out, install the Y valves and figure out the best way to align and find the best spot for the macerator pump. The hose that leads to the Thru-hull would NOT go on so I ended up getting a heat gun and after sometime was able to get it to seat.

I make my project videos on the slow side letting people see what I did and how I dealt with obstacles, in past videos my viewers have thanked me for not jumping over all of the details and getting right to the finished project so while this might not be the most exciting video it might help some people out there see how I dealt with certain aspects of the project.

Thanks for watching!

fair winds,
Sailor James

patreon: https://www.patreon.com/sailorjames
website: http://svtriteia.com
insta: https://www.instagram.com/james.the.sailor.man

Mostrar más

 0 Comentarios sort   Ordenar por


Hasta la próxima