اگلا

129 - Shipyard work in Langkawi Part 1

6,187 مناظر· 14/05/25
Onfilandtime
Onfilandtime (@Onfilandtime)
سبسکرائبرز
0

This is part 1 of 2 episodes in the shipyard. So if you like to see boat projects, this one's for you. Work includes: - inspecting the Coppercoat and starting the sanding, patching, and painting work to get rid of the bubbles that had been bothering us since we've been on the boat; - replacing the built-in swim ladder, that was allowing rusty water to enter the engine room; - starting work on the underwater light circuit in the swim platform; - topside crack filling / painting; - service to the Gori folding propellors; - sail drive oil changes; - cleaning hard-to reach areas to collect metallic debris that was causing rust streaks on the hull; - marking the anchor rode/chain. Thanks for following! Music downloaded at https://filter.one and Youtube music Video edited by Jea, using Adobe Premiere Elements. Visit us at http://www.onfilandtime.com/

مزید دکھائیں

 0 تبصرے sort   ترتیب دیں


اگلا